PVC Plastic Floor Installation Method

Sep 11, 2022

Leave a message

Once the existing floor is removed, it is necessary to lay a self-leveling floor.

 

When applying self-leveling ground, it is important to ensure that the surface is uniform and level. To achieve this, a 2-meter ruler should be used to inspect the surface, making sure that the gap between any two points does not exceed 2mm. This will ensure that the final result provides a smooth, level finish for the flooring material to be installed on top of.

 

To achieve a satisfactory result when self-leveling a floor, it is important to note that the surface should not be overly rough, with minimal pores and a smooth surface. These factors play important roles in ensuring that the leveling process is effective and the desired outcome is achieved.

 

Before construction, it is important to ensure that the ground foundation remains dry.

 

It is essential to ensure that the glue used to attach the steps of the stairs to the floor is fully covered and not missed. This will prevent any potential safety hazards and ensure a sturdy and secure staircase.

 

For the best paving results, it is important to align the positive and negative angles of the working face at a 90 degree angle when sticking to the floor. This will help ensure that the paving effect is achieved.

 

The laid floor must remain intact with no shelling or warping.

 

8. The joints of the floor should be flat.